Sheraton Denver Downtown
Deadlines
Space reservation deadline: Feb. 6, 2020 | Materials due: Feb. 13, 2020
Installation begins at Noon on March 19, 2020.
Dismantle begins at 5 p.m. on March 22, 2020.
Front Desk Column Clings
Three large columns are wrapped with your branding for guests to see as they check in at the front desk, walk to the elevators, and anytime they visit the lobby.
Rate
$25,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Front Drive/Main Entrance Branding
- Powerful visibility for your message on the front drive and at the main entrance to the hotel.
- Includes one revolving door, two stationary doors and surrounding glass panels, and 14 large windows along front drive.
Rate
$50,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Lobby Elevator Clings
- Six highly visible lobby elevators take guests to their rooms in the Tower Building, or to the second floor where Plaza Building guests access the skywalk to their rooms.
- Outside branding only.
Rate
$40,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Lobby Escalator Runner
- In the center of the lobby and highly visible as guests wait for lobby elevators.
- Also used by guests in the Plaza Building to access the second floor and the skywalk to their rooms.
Rate
$15,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Lobby Gobos
- Your brand in lights 24/7 in the hotel lobby!
- Two positions sold together:
- Front entrance floor
- Wall above front desk
Rate
$17,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Lobby Stair Cling
- In the center of the lobby and highly visible as guests wait for lobby elevators.
- Also used by guests in the Plaza Building to access the second floor and the skywalk to their rooms.
Rate
$30,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Deadlines
Space reservation deadline: Feb. 6, 2020 | Materials due: Feb. 13, 2020
Installation begins at Noon on March 19, 2020.
Dismantle begins at 5 p.m. on March 22, 2020.