Hotel Advertising: JW Marriott Water Street
AAD Innovation Academy 2023 INC programs will be held at this hotel!
Deadlines
Space reservation: June 30, 2023
Materials due: July 10, 2023
Installation to be completed by 9 a.m. on Thursday, Aug. 10, 2023.
Dismantle begins after 5 p.m. on Saturday, Aug. 12, 2023.
Column Wraps
Visibility for your message throughout the Level 2 pre-function areas with three column wraps that can’t be missed by attendees.
Rate
$6,000
Rights only. Additional production fees will apply.
Exclusive opportunity.
Escalator Package SOLD
Welcome attendees to INC programs and other ancillary meetings on Level 2 of the hotel. This escalator comes from the lobby.
Package includes:
- Escalator caps on Level 2, as shown.
- Two window clings at the top of the escalator.
Rate
$6,000 SOLD
Rights only. Additional production fees will apply.
Exclusive opportunity.
Floor Clings SOLD
Strategically place your message on floor clings outside the elevator banks on
Level 2, where the INC programs and other AAD Innovation Academy meetings
will be held.
Rate
$2,500 SOLD
Rights only. Additional production fees will apply.
Exclusive opportunity.
Wall Cling
- Huge visibility throughout Level 2 with this wall cling facing into the
pre-function area. - Sponsor also has the option to add two windows in front of HB Plant
pre-function area D.
Rate
$6,500 wall
$5,000 windows
Rights only. Additional production fees will apply.
Exclusive opportunity.
Window Clings
- Four window clings in the Ybor pre-function area.
- Four window clings in front of Ybor pre-function Salon I and II.
- Four window clings in front of Ybor pre-function Salon III.
- Four window clings in front of the hallway between Ybor and HB Plant ballrooms.
- Four window clings in front of HB Plant pre-function area A.
- Four window clings in front of HB Plant pre-function area B.
- Four window clings in front of HB Plant pre-function area C.
Rate
$5,000 each set
Rights only. Additional production fees will apply.
Each set is an exclusive opportunity.
Deadlines
Space reservation: June 30, 2023
Materials due: July 10, 2023
Installation to be completed by 9 a.m. on Thursday, Aug. 10, 2023.
Dismantle begins after 5 p.m. on Saturday, Aug. 12, 2023.